Extension in Carlton-in-Lindrick

Here is another extension for a customer in Carlton-in-Lindrick.

This extension has one large room which will be a living room area and another room which will be a shower room.

The external wall is being done in British Gypsum Thermaline board 38mm in total with insulation 25mm and 12.5mm board on top.

All the other walls will be done in normal wall board which is 12.5mm thickness.

The ceiling will be done with 15mm board.

All dot and dab with one metal stud wall being put up to hide the water feeds and waste for the shower.

Gyproc Wall Board

Thermaline Board

Metal Stud Walls

Work Started

Boarding & Skimming photos